Risk Assessment Based on Sources in The Bali Public School Project and Mitigation Actions Plan
Abstract
Keywords
Full Text:
PDFReferences
R. Milyardi, “Perbandingan Karakteristik Manajemen Risiko Konstruksi Pada Kontraktor Bumn Dan Swasta,” Jurnal Teknik Sipil, vol. 16, no. 1, pp. 12–37, Apr. 2020, doi: 10.28932/jts.v16i1.2399.
A. Van Os, F. Van Berkel, D. De Gilder, C. Van Dyck, and P. Groenewegen, “Project risk as identity threat: explaining the development and consequences of risk discourse in an infrastructure project,” International Journal of Project Management, vol. 33, no. 4, pp. 877–888, May 2015, doi: 10.1016/j.ijproman.2014.10.016.
A. Alameri, A. S. A. M. Alhammadi, A. H. Memon, I. A. Rahman, and N. A. N. Nasaruddin, “Assessing the Risk Level of the Challenges Faced In Construction Projects,” Engineering, Technology & Applied Science Research, vol. 11, no. 3, pp. 7152–7157, Jun. 2021, doi: 10.48084/etasr.4020.
N. B. Siraj and A. R. Fayek, “Risk Identification and Common Risks in Construction: Literature Review and Content Analysis,” J Constr Eng Manag, vol. 145, no. 9, Sep. 2019, doi: 10.1061/(ASCE)CO.1943-7862.0001685.
J. Chilumo et al., “Risk Management Practices on Performance of Building Construction Projects,” Journal of Entrepreneurship & Project Management, vol. 4, no. 6, pp. 38–57, 2020.
H. Syahputra, W. Abdillah, S. Widodo, and S. Anwar, “Manajemen Risiko Proyek berdasarkan Panduan Body Of Knowledge Manajemen Proyek 2017,” Jurnal Manajemen dan Bisnis, vol. 2, no. 1, pp. 01–13, Apr. 2022, doi: 10.32509/jmb.v2i1.1987.
A. Shibani et al., “Financial risk management in the construction projects,” Journal of King Saud University - Engineering Sciences, May 2022, doi: 10.1016/j.jksues.2022.05.001.
M. Afiq, “Manajemen Risiko pada Proyek Pembangunan Gedung Asrama Mahasiswa UIN Walisongo Tahun 2021,” Akselerasi : Jurnal Ilmiah Teknik Sipil, vol. 3, no. 1, Aug. 2021, doi: 10.37058/aks.v3i1.3561.
I. P. B. Dharma, I. G. A. A. I. Lestari, T. I. Praganingrum, and I. G. G. Wiryadi, “Identifikasi Risiko Proyek Pembangunan Gedung SMAN 9 Denpasar Terhadap Aspek Keselamatan dan Kesehatan Kerja,” Jurnal Ilmiah Teknik Unmas Denpasar, vol. 2, no. 2, Oct. 2022.
M. A. Setiawan, I. K. Sucita, and B. Sarwono, “Penerapan Manajemen Risiko pada Proyek Konstruksi Gedung (Studi Kasus Proyek Apartemen Apple 3 Condovilla – Jakarta Selatan),” Construction and Material Journal, vol. 3, no. 3, pp. 197–205, Dec. 2021, doi: 10.32722/cmj.v3i3.4132.
I. G. A. A. I. Lestari, I. D. K. Sudarsana, I. N. Y. Astana, and A. A. G. A. Yana, “Risk Identification for Subsidized Housing Developer in Bali,” in 6th International Conference on Sustainable Develovment (ICSD) 2023, Denpasar: Universitas Mahasaraswati Denpasar, 2023, pp. 18–26.
M. Alkaissy, M. Arashpour, B. Ashuri, Y. Bai, and R. Hosseini, “Safety management in construction: 20 years of risk modeling,” Saf Sci, vol. 129, p. 104805, Sep. 2020, doi: 10.1016/j.ssci.2020.104805.
Z. Zhang, W. Li, and J. Yang, “Analysis of Stochastic Process to Model Safety Risk in Construction Industry,” Journal of Civil Engineering and Management, vol. 27, no. 2, pp. 87–99, Feb. 2021, doi: 10.3846/jcem.2021.14108.
H. Sadeghi, S. R. Mohandes, M. R. Hosseini, S. Banihashemi, A. Mahdiyar, and A. Abdullah, “Developing an Ensemble Predictive Safety Risk Assessment Model: Case of Malaysian Construction Projects,” Int J Environ Res Public Health, vol. 17, no. 22, p. 8395, Nov. 2020, doi: 10.3390/ijerph17228395.
N. M. Jaya, G. A. P. C. Dharmayanti, and D. A. R. Ulupie Mesi, “Manajemen Risiko K3 (Keselamatan dan Kesehatan Kerja) pada Proyek Pembangunan Rumah Sakit Bali Mandara,” JURNAL SPEKTRAN, vol. 9, no. 1, p. 29, Jul. 2021, doi: 10.24843/SPEKTRAN.2021.v09.i01.p04.
H. Sadeh, C. Mirarchi, and A. Pavan, “Integrated Approach to Construction Risk Management: Cost Implications,” J Constr Eng Manag, vol. 147, no. 10, Oct. 2021, doi: 10.1061/(ASCE)CO.1943-7862.0002140.
P. S. Godfrey, Control of risk: a guide to the systematic management of risk from construction. Construction Industry Research and Information Association, 1996.
N. Rastogi and M. K. Trivedi, “PESTLE technique–a tool to identify external risks in construction projects,” International Research Journal of Engineering and Technology (IRJET), vol. 3, no. 1, pp. 384–388, 2016, Accessed: Nov. 05, 2024. [Online]. Available: https://www.irjet.net/archives/V3/i1/IRJET-V3I165.pdf
H. Darmawi, Manajemen Risiko Edisi 2. Jakarta: Bumi Aksara, 2016.
P. Z. Razi, M. I. Ali, and N. I. Ramli, “Incorporation of Risk Index for Risk Response and Risk Mitigation Strategies of Public-Private Partnership (PPP) Housing Construction Project in Malaysia,” IOP Conf Ser Mater Sci Eng, vol. 712, pp. 1–8, Jan. 2020, doi: 10.1088/1757-899x/712/1/012031.
I. Lenaini, “Teknik Pengambilan Sampel Purposive dan Snowball Sampling,” Jurnal Kajian, Penelitian & Pengembangan Pendidikan Sejarah, vol. 6, no. 1, pp. 33–39, Jun. 2021, doi: 10.31764/historis.vXiY.4075.
R. Flanagan and G. Norman, Risk Management and Construction, 1st ed. Boston: Blackwell Scientific, 1993.
DOI: http://dx.doi.org/10.52155/ijpsat.v50.1.7131
Refbacks
- There are currently no refbacks.
Copyright (c) 2025 I Gusti Agung Ayu Istri Lestari, I Gede Gegiranang Wiryadi, Debiani Astiti Ina Kii

This work is licensed under a Creative Commons Attribution 4.0 International License.